Energy modeling is the process of forecasting how much energy a system will consume and simulating the change when certain parameters are adjusted. Energy modeling is a useful tool for data centers as it assists in analyzing how to lower energy consumption making the facility more efficient.
Sensors help you keep track of important environmental parameters in your data center. Typically data centers have multiple sensors installed. Temperature, humidity, power, water leak, and more. In this article, we wil
Cooling IT hardware in a data center is a function that needs the utmost priority. However, cooling through airflow management alone is not sufficient. One must consider the complex nature of the IT environment
Data centers consume a lot of energy, especially in terms of cooling the IT equipment. However, investment in variable frequency drives (VFD) and energy-efficient motors makes a huge contribution to reducing energy use.
AKCP, the world’s oldest and largest supplier of networked wired and wireless sensor solutions has scanned all their hardware and software platforms for the latest Log4j vulnerability.
If data center managers can forecast the future they can reduce downtime, wasted energy, and data center design problems as a result. Accurate future forecasts are no longer unattainable with
The goal of the environmental monitoring system is to detect and evaluate environmental factors using sensors and data-gathering terminals. It guarantees that the areas with the most significant
According to the Environmental Protection Agency (EPA), data centers consumed 2% (61 billion kWh) of total electricity usage in the United States in 2006. Surprisingly, IT equipment accounted for
When it comes to handling temperature-sensitive, high-value equipment, assets, or perishable goods, there’s a lot on the line. A remote temperature monitoring system is essential for a variety of
It is common knowledge that data centers consume huge amounts of power. Almost all this power is dissipated as heat which must be removed. It is no secret that the cooling system after the
Schedule a Demo With Us
Find out how we can Protect, Monitor and Optimize your Data Center
Interested in our FREE Data Center PUE check?
Contact us below and schedule a 15 minute consultation