Here’s an updated Timelapse video of the progress so far. The studs are all in place, and the roof beams are starting to be welded into position.
At the same time, the stud wall paneling is being installed with layers of insulation behind it. This insulation will help with sound, but more importantly preventing heat losses through the walls to the outside. In order to have an efficient a data center as possible, it is vital that the cold air contained in the data center is preserved. That way the cooling energy can be passed onto the servers rather than being lost to the surrounding air temperatures.